Gantry Crane for Shield Tunneling Machine

 

  • Capacity:200-400T
  • Working level:A4
  • Rail recommended:QU100
  • Brand: WeiHua
  • Product Type:Gantry crane

Advantages of Gantry Crane for Shield Tunneling Machine:

Gantry Crane for Shield Tunneling Machine is mainly used for the installation of the cutter head and shield body of the shield machine of the underground trenchless equipment, as well as the hoisting and transportation of the tunnel support segment during the construction process; the special sling is used, and the sling can be 360°. Rotating, suitable for the installation of different angles of the cutter head; adopting the double trolley structure, the two trolleys can be linked together to lift the cutter head, and can also work independently to lift the segment. When there is a larger hoisting tonnage, the hoisting adopts open gear transmission, which reduces the equipment cost.

The working system of Gantry Crane for Shield Tunneling Machine is A4, and the recommended rails are QU80-QU100. The lifting capacity is 200-400 tons.

Features of Gantry Crane for Shield Tunneling Machine:

  1. Gantry Crane for Shield Tunneling Machine is mainly used for the installation of the cutter head and shield body of the shield machine of the underground trenchless equipment, as well as the hoisting and transportation of the tunnel support segment during the construction process.
  2. The hoist sling is used, which can be rotated 360°, which is suitable for the installation of different angles of the cutter head.
  3. Adopting double trolley structure, the two trolleys can be linked together to lift and hoist the cutter head, and can also work independently to hoist and transport segments.
  4. The hoisting adopts open gear transmission, which saves the cost.

Lifting capacity(t)

400

100

130

Working level

A3

A4

A4

Span(m)

33

20-24

20-24


Main lifting height(m)

24(up rail)

/23(under rail)

9.8+30(up rail 9.8,under rail 30)

9.8+30(up rail 9.8,under rail 30)

Deputy lifting height(m)

22(up rail)

/26(under rail)

Main lifting Speed(m/min)
 

0.09~0.9

0.37~3.7~6

0.37~3.7~6

Deputy lifting Speed(m/min)
 

7

1.4~14

Crane travelling Speed(m/min)

1.6~16

2.5~25

2.5~25

Crab travelling Speed(m/min)

1.15~11.5

1.4~14

1.4~14

L1(mm)

2500

1270

1250

L2(mm)

3500

1270

1250

H1(mm)

3196

16240

15920

H2(mm)

22000

9800

9800

B(mm)

14000

16380

16180

B1(mm)

22800

b1(mm)

1920

b2(mm)

1250

W(mm)

4500

10700

10700

D(mm)

6000

6500

6500

Max. wheel load(KN)

406

230

270

Rail recommended

QU100

QU80

QU80

Power

Three-phase AC 50Hz 380V

Three-phase AC 50Hz 380V

Three-phase AC 50Hz 380V

Spreader rotation angle

±90°

Cutter diameter(m)

15