Brückenkräne
QC Electromagnetic Bridge Crane is a special design overhead crane that utilizes electromagnetic principle for material lifting. It has an irreplaceable role in lifting magnetic materials in the industrial field. An electromagnetic bridge crane greatly improves the efficiency and convenience of handling magnetic materials.
QC Electromagnetic Bridge Crane has a bridge frame, electric trolley, electrical electromagnetic suction cups, and other vital parts. The bridge is the main part of the whole crane, providing stable support for other parts and bearing loads in the lifting process. The trolley running mechanism makes the bridge crane move flexibly on the rail to expand the operation range. Its electric trolley moves horizontally on the bridge and works in concert with the trolley running. Therefore, it provides precise positioning of the electromagnetic suction cup in space. As the core component, the special design of the electromagnetic suction cup can adsorb the magnetic materials to realize safe and efficient lifting.
Der elektromagnetische QC-Laufkran ist weit verbreitet in Eisen- und Stahlwerken, Maschinenfabriken, metallurgischen Fabriken, Hafenterminals und anderen Orten, an denen magnetische Materialien gehoben werden müssen. In Stahlwerken kann er magnetische Stahlmaterialien wie Stahlknüppel und -platten handhaben.
In Maschinenfabriken ist er für die Handhabung magnetischer Teile geeignet. In metallurgischen Fabriken ist er in der Lage, alle Arten von magnetischen Erzen und anderen Rohmaterialien zu heben. Und in Hafenterminals kann dieser Brückenkran problemlos das Be- und Entladen von magnetischen Gütern übernehmen.
Modell | QC Elektromagnetischer Brückenkran | |||||
Tragfähigkeit(t) | 16/3.2 | 20/5 | 32/5 | 50/10 | ||
Spannweite(m) | 10.5-31.5 | |||||
Hebehöhe | 16/18 | 12/14 | 16/18 | 12/16 | ||
Arbeiterklasse | A6 | |||||
Geschwindigkeit (m/min) | Heben | Elektromagnetische | 13 | 9.7 | 9.5 | 7.8 |
Aux.haken | 14.5 | 12.7 | 12.7 | 13.2 | ||
Trolley fahren | 44.6 | 44.6 | 42.4 | 38.5 | ||
Kranfahren | 112.5/101.4 | 112.5/101.4 | 101.8/86.8 | 86.8/87.3 | ||
Stromversorgung | 380v, 50HZ, 3phasig oder kundenspezifische Ausführung |
Sie können uns gerne eine Nachricht hinterlassen. Wir werden innerhalb von 24 Stunden antworten.
Antrag einreichen