Four-beam four-track large foundry crane shipped

May 10

320-ton, 31-meter span crane contracted by Weihua

Four-beam, four-rail large foundry crane

was successfully shipped

foundry crane shipped
foundry crane shipped

This product is the largest casting crane with the same tonnage and the longest span among the casting cranes that Weihua has shipped so far.

The largest tonnage and the longest span casting crane

Currently serving Tangshan Wenfeng Special Steel Co.

As the core equipment of its production workshop

Weihua 5 sets of 320t four-beam and four-rail foundry crane

are located in

Smelting span and refining span

They will be safe, reliable, intelligent and efficient service

Witness the rise of a modern steel mill

foundry crane
320T foundry crane

Weihua has been deeply engaged in the steel industry for many years

Steel smelting metallurgy casting crane performance record high

From innovative design to assembly and welding

Weihua has accumulated a wealth of design and production experience

Product technology is mature and stable

Trusted and praised by customers

Four-beam foundry crane
320T Four-beam foundry crane

Weihua has been deeply engaged in the steel industry for many years

Steel smelting metallurgy casting crane performance record high

From innovative design to assembly and welding

Weihua has accumulated a wealth of design and production experience

Product technology is mature and stable

Trusted and praised by customers

foundry crane

●Innovative product design

The product adopts a redundant design to ensure normal lifting of high-temperature liquid metal under any circumstances, improving the safety system with high-reliability performance.

the product is highly optimized, and parts of the same parts are interchangeable in an equivalent manner, reducing daily maintenance costs

Gantry hook spreader adopts patented design, with adjustable spacing and variable tonnage. Meet the multi-purpose needs of customers’ workshop process.

● Special processing technology

Overall annealing and processing of the main lifting carriage and overall processing of the bridge to ensure the installation accuracy and stable operation of each part.

● Complete operation system

The transformer adopts a double-variable voltage mode to ensure the stability of the system; multi-layer safety management warning devices are set to ensure the safety of equipment operation.